Heating subsidies for businesses: what KfW 459 and 522 pay – and what disappears in 2027
Businesses get a 30 per cent grant for a heating replacement from KfW 459 or 522, no bonuses. From 2027, heat pumps without EU origin get only 15 per cent.
The short answer
A company replacing a heating system receives a grant from the state development bank KfW of 30 per cent of eligible costs – via programme 459 for residential buildings and programme 522 for non-residential buildings. That is all: the bonuses that take owner-occupiers to 70 or 80 per cent are tied to the owner’s own home and are not available to businesses, landlord companies or contractors.
Anyone with the advertised figure “up to 70 per cent” in mind should first read the comparison between landlords and owner-occupiers. This article covers the corporate side: which programme applies, how high the caps are, what a hotel with 1,500 square metres actually receives – and why the sums change from the first quarter of 2027. Whether the grant pays off more in own investment or in contracting is a second question.
Which programme applies to which building?
The Federal Funding for Efficient Buildings – Individual Measures (BEG EM) is one guideline but four KfW products. What matters is the applicant and the building type:
| Programme | Applicant | Building | Subsidy rate for heating |
|---|---|---|---|
| KfW 458 | private individuals | residential | 30 % plus bonuses for owner-occupiers |
| KfW 459 | companies, legal entities, partnerships, cooperatives, owners’ associations, contractors | residential | 30 % |
| KfW 522 | companies, contractors, freelancers, chambers, churches, non-profit bodies, also private individuals | non-residential | 30 % |
| KfW 422 | municipalities, special-purpose associations | both | 30 % |
Mixed-use buildings run through programme 459 if the residential floor area makes up more than 50 per cent of the heated area; the costs for the commercial areas are then co-funded but do not count as dwelling units (fact sheet 459, as of 09/2026). A hotel, a care home with predominantly care floor space, a production hall or an office building are non-residential buildings and belong in programme 522.
Both corporate programmes fund the same catalogue: electric heat pumps, biomass with low particulate emissions, solar thermal, innovative technology based on renewable energy and the connection to a building or district heating network. Required are an existing building whose planning application is at least five years old, and hydraulic balancing of the entire distribution system.
How much grant does a company get?
30 per cent of the eligible total costs. On top of that, 50 per cent of the costs of specialist planning and construction supervision by an energy efficiency expert (BEG EM, section 8.4.7); for bridge financing there is the supplementary loan 358/359.
What is not available is stated just as clearly in the guideline: the climate speed bonus of currently 16 percentage points is granted to “owner-occupiers only for the owner-occupied dwelling unit” (section 8.4.4), and the income bonus likewise only to owner-occupiers. For every company, every partnership and every contractor it stays at 30 per cent – but without an income test and for any number of properties.
One particular point that matters for contracting models: rental, hire-purchase, leasing and contracting are also eligible. The contractually agreed instalments can be counted as eligible costs for up to ten years; the contract is submitted instead of the invoice (fact sheet 459).
How high are the eligible costs?
The grant is not based on the invoice but on a cap. For residential buildings it depends on the number of dwelling units, for non-residential buildings on the heated net floor area (BEG EM, section 8.3.1; KfW product pages, as of November 2026):
| Building | Cap on eligible costs |
|---|---|
| residential, 1st dwelling unit | €28,000 |
| residential, 2nd to 6th dwelling unit | €15,000 each |
| residential, from the 7th dwelling unit | €8,000 each |
| non-residential up to 150 m² net floor area | €28,000 |
| non-residential, share above 150 up to 400 m² | €197 per m² |
| non-residential, share above 400 up to 1,000 m² | €118 per m² |
| non-residential, share above 1,000 m² | €79 per m² |
If the new heating serves only part of the building, the cap is reduced proportionally. KfW works it through on its product page: for 500 square metres of net floor area, at most 89,050 euros are eligible and the grant is 26,715 euros; if the system serves only half the area, both figures are halved.
These rates are not fixed. From 1 February 2027 they fall every six months: the amount for the first dwelling unit and for small non-residential buildings by 750 euros each, the per-square-metre rates by 3, 2 and 1 euro down to 173, 102 and 71 euros from August 2030. The date of application is decisive.
What does KfW pay for a hotel with 1,500 m²? A worked example
Assumptions: existing hotel, 1,500 square metres of heated net floor area, replacement of the gas boilers with a large heat pump for 240,000 euros gross (a freely chosen figure), application under programme 522.
| Item | Application in 2026 | Application from 1 Feb 2027, heat pump from the EU | Application from 1 Feb 2027, heat pump from outside the EU |
|---|---|---|---|
| Cap on eligible costs | €187,550 | €184,350 | €184,350 |
| Subsidy rate | 30 % | 15 % + 15 % value-added bonus | 15 % |
| Grant | €56,265 | €55,305 | €27,653 |
| Own share of €240,000 | €183,735 | €184,695 | €212,347 |
| Grant as a share of the investment | 23.4 % | 23.0 % | 11.5 % |
The 2026 cap is made up of 28,000 euros for the first 150 square metres, 250 × 197 euros, 600 × 118 euros and 500 × 79 euros. Two things stand out: even today the grant is not 30 but a good 23 per cent of the actual investment, because the cap bites. And from 2027 the origin of the heat pump decides about 27,000 euros – a difference that belongs in every tender evaluation. Residential buildings are no different: twelve flats give at most 151,000 euros of eligible costs and a 45,300-euro grant under programme 459, whatever the heating costs.
What changes from the first quarter of 2027?
The BEG EM guideline published on 17 July 2026 and in force since 21 July contains four changes that businesses must now build into their timetable:
- Heat pump subsidy rate halved. For electrically driven heat pumps the subsidy rate from the first quarter of 2027 is only 15 per cent (section 8.4.1). Biomass, solar thermal and network connections stay at 30 per cent.
- Value-added bonus. Heat pumps “originating in the Union” receive an additional 15 percentage points (section 8.4.6) – arithmetically back to 30 per cent. What counts as EU origin is set out in a KfW information sheet that will be decisive in practice.
- No subsidy for replacing young renewable systems. If a building is already supplied by a subsidised technology – such as a heat pump or biomass – that went into operation on or after 1 January 2008, the replacement is no longer funded (section 5.3). For older renewable systems, only a flat 25 per cent of total costs counts as eligible (section 8.3.3). Replacing gas, oil and coal boilers is unaffected.
- Caps fall every six months from 1 February 2027, as described above.
The expiring climate speed bonus plays no role for companies – they never received it. Their key date is the turn of the year 2026/2027, when the grant for a heat pump from outside the EU halves.
How does the application work – and where do businesses fail?
The procedure is the same in both programmes and strictly formal. First, an energy efficiency expert or the installer issues a confirmation for the application (BzA, or gBzA for non-residential buildings). Then the supply or works contract is concluded – mandatorily with a condition precedent or condition subsequent that makes the contract effective only once the funding commitment arrives. A condition inserted afterwards is not permitted. Only then does an authorised representative submit the application in the “Meine KfW” portal, before the project begins.
After the commitment, 36 months remain for implementation; the evidence must be submitted no later than six months after the final invoice. The subsidy is subject to the availability of budget funds; there is no legal entitlement.
Two traps hit companies in particular. First: anyone who is not the owner of the building – the contractor, the tenant, the operating company – needs an owner who is eligible themselves, was informed of the subsidy and the cap before the application, and confirms their obligations in writing (section 6.1). Second: anyone who signs the contract without the funding condition because the heating failed in winter has lost the grant.
What businesses should do now
- Classify the building: residential floor area above 50 per cent means programme 459 and the dwelling-unit scale, otherwise programme 522 and the square-metre scale.
- Calculate the cap before the quotation and state the grant as a percentage of the real investment – it is usually well below 30 per cent.
- For heat pumps, include the origin of the unit in the tender evaluation; from 2027 it decides half of the grant.
- Submit applications for heat pumps from outside the EU and for non-residential buildings above 400 square metres before the turn of the year if possible – with BzA, conditional contract and portal access.
- For contracting or leases, obtain the owner’s confirmation under section 6.1 before the application, not afterwards.
- Apply for specialist planning and construction supervision at 50 per cent as well, and write the deadlines – 36 months for implementation, 6 months for evidence – into the project plan.
FAQ
What heating subsidy does a company get in Germany?
A grant of 30 per cent of eligible costs for a heat pump, biomass, solar thermal or a connection to a building or district heating network – via KfW programme 459 for residential buildings and programme 522 for non-residential buildings. The bonuses of the private programme 458 (climate speed, income) are not available to companies.
How high are the eligible costs for a non-residential building?
28,000 euros for buildings up to 150 square metres of net floor area, above that on a sliding scale: 197 euros per square metre up to 400 square metres, a further 118 euros per square metre up to 1,000 square metres and 79 euros for each further square metre (BEG EM, section 8.3.1, as of 17 July 2026). From 1 February 2027 the rates fall every six months.
May a contractor apply for the subsidy?
Yes. The BEG EM guideline expressly names contractors among the eligible investors (section 6.1). If the applicant is not the owner, the owner must be eligible themselves, must be informed of the subsidy and the maximum amount before the application, and must confirm their obligations.
What changes in 2027 for company heating subsidies?
From the first quarter of 2027 the subsidy rate for heat pumps falls to 15 per cent; a value-added bonus of 15 percentage points is only granted for heat pumps originating in the EU. In addition, the caps fall every six months from 1 February 2027, and replacing a renewable system that has been in operation since 2008 is no longer subsidised.
Sources
- KfW: Heizungsförderung für Unternehmen – Wohngebäude (459), Produktseite mit Berechnungsbeispiel (abgerufen 16.11.2026)
- KfW: Heizungsförderung für Unternehmen – Nichtwohngebäude (522), Produktseite mit Berechnungsbeispielen (abgerufen 16.11.2026)
- KfW: Merkblatt Zuschuss 459 Heizungsförderung für Unternehmen – Wohngebäude, Stand 09/2026 (Bestellnummer 600 000 5132)
- BMWE: Richtlinie für die Bundesförderung für effiziente Gebäude – Einzelmaßnahmen (BEG EM) vom 17. Juli 2026, in Kraft seit 21.07.2026 (Nummern 5.3, 6.1, 8.3, 8.4)
Editorial note: researched and drafted with AI support; selection, analysis and quote are reviewed and owned by Pedram Dadgar. Corrections are marked with a date. How we work